Tus realizaciones, nuestra experiencia

Aartsen Fruit

New high tech office building with large surface of windows in need of heating and cooling at the same time. 4-pipe system had to be installed without being seen from the outside.

Office is equipped with floorheating and cooling with high tech secondary circuit. LCP is supplying hotwater and cold water buffertank in primary system. Unit is positioned behind louvre wall which is part of the building.

Direcciones:
Breda, Nederland

Estudio de caso y soluciones técnicas utilizadas:
Investigation of the positioning of the unit behind the louvre wall and low noise level were the challanges in this project.